Message id | Publication date UTC | Start date UTC | End date UTC | Event status | Umm type | Market participant | Affected asset | Unavailable | Remarks | Actions |
---|---|---|---|---|---|---|---|---|---|---|
22-0111A0002323R.PL-00004_001 | 2022-01-11 08:39:43 | 2022-01-18 17:55 | 2022-01-18 22:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0124A0002323R.PL-00012_001 | 2022-01-24 08:49:28 | 2022-01-25 18:30 | 2022-01-25 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0112A0002323R.PL-00005_002 | 2022-01-12 09:32:55 | 2022-01-13 08:55 | 2022-01-13 10:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na prace modernizacyjne systemów informatycznych DBAG (operator central... | |||
22-0121A0002323R.PL-00010_001 | 2022-01-21 10:00:44 | 2022-01-31 07:55 | 2022-01-31 11:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na prace modernizacyjne systemów informatycznych DBAG (operator central... | |||
21-1229A0009591D.PL-00152_001 | 2021-12-29 14:50:08 | 2021-12-31 23:00 | 2022-12-31 22:59 | Active | OTHER | EuRoPol GAZ SA A0009591D.PL [ace] | The tariff set by SGT EuRoPol GAZ s.a. for transmission services for the period from January 1, 2... | |||
22-0124A0002323R.PL-00013_001 | 2022-01-24 13:38:09 | 2022-01-27 21:30 | 2022-01-27 23:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO (pełn... | |||
22-0125A0002323R.PL-00016_003 | 2022-01-26 00:51:56 | 2022-01-25 23:21 | 2022-01-26 00:13 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje o nieplanowanym zawieszeniu procesu Jednolitego łączenia Rynku Dnia Bieżącego w dni... | |||
22-0202A0002323R.PL-00020_001 | 2022-02-02 14:51:11 | 2022-02-04 19:00 | 2022-02-05 11:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A. jako OSP informują o zawieszeniu przyjmowania Grafików Wymiany Międzysystemowej (GWM) w ... | |||
22-0222A0002323R.PL-00031_001 | 2022-02-22 13:54:52 | 2022-02-22 18:30 | 2022-02-22 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0210A0002323R.PL-00022_001 | 2022-02-10 17:03:59 | 2022-02-17 21:30 | 2022-02-17 22:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO / NOR... | |||
22-0222A0002323R.PL-00032_001 | 2022-02-22 13:58:45 | 2022-03-01 18:30 | 2022-03-01 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0222A0002323R.PL-00033_001 | 2022-02-22 14:14:55 | 2022-02-24 08:55 | 2022-02-24 09:45 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych DBAG w dni... | |||
22-0315A0002323R.PL-00076_001 | 2022-03-15 12:29:24 | 2022-03-24 08:55 | 2022-03-24 10:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych DBAG w dni... | |||
22-0427A0002237K.PL-00173_001 | 2022-04-27 06:22:52 | 2022-04-27 06:17 | Active | OTHER | PGNiG SA A0002237K.PL [ace] | Please be informed, that on 27th of April 2022, 6:17 (UTC) PAO Gazprom/OOO Gazprom Export („Gazpr... | ||||
22-0427A0002237K.PL-00174_001 | 2022-04-27 06:23:26 | 2022-04-27 06:08 | Active | OTHER | PGNiG SA A0002237K.PL [ace] | Please be informed, that on 27th of April 2022, 6:08 (UTC) PAO Gazprom/OOO Gazprom Export („Gazpr... | ||||
22-0420A0002323R.PL-00151_001 | 2022-04-20 10:59:01 | 2022-04-26 07:55 | 2022-04-26 10:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych DBAG w dni... | |||
22-0427A0002237K.PL-00175_001 | 2022-04-27 06:24:09 | 2022-04-27 06:02 | Active | OTHER | PGNiG SA A0002237K.PL [ace] | Please be informed, that on 27th of April 2022, 6:02 (UTC) PAO Gazprom/OOO Gazprom Export („Gazpr... | ||||
22-0427A0002237K.PL-00176_001 | 2022-04-27 06:24:38 | 2022-04-27 06:03 | Active | OTHER | PGNiG SA A0002237K.PL [ace] | Please be informed, that on 27th of April 2022, 6:03 (UTC) PAO Gazprom/OOO Gazprom Export („Gazpr... | ||||
22-0510A0002323R.PL-00199_001 | 2022-05-10 21:09:46 | 2022-05-10 20:30 | 2022-05-11 01:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na wydłużenie czasu trwania zaplanowanych prac modernizacyjnych systemó... | |||
22-0510A0002323R.PL-00200_001 | 2022-05-10 21:33:33 | 2022-05-10 21:30 | 2022-05-10 21:31 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że zaplanowane prace modernizacyjne systemów informatycznych EPEX (pełniącego role... | |||
22-0504A0002323R.PL-00186_001 | 2022-05-04 06:13:11 | 2022-05-10 17:40 | 2022-05-10 20:15 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EPEX (pełn... | |||
22-0510A0002323R.PL-00201_001 | 2022-05-10 21:41:14 | 2022-05-10 21:38 | 2022-05-10 21:38 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że zaplanowane prace modernizacyjne systemów informatycznych EPEX zostały zakończo... | |||
22-0524A0002323R.PL-00232_001 | 2022-05-24 05:40:42 | 2022-05-24 16:55 | 2022-05-24 19:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0322A0002323R.PL-00093_001 | 2022-03-22 10:04:07 | 2022-03-22 18:30 | 2022-03-22 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0614A0002323R.PL-00262_001 | 2022-06-14 09:30:50 | 2022-06-21 16:55 | 2022-06-21 19:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
23-0124A0002323R.PL-00040_001 | 2023-01-24 21:29:56 | 2023-01-24 20:30 | 2023-01-24 21:20 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z problemy techniczne systemów informatycznych CEPS zostały rozwiązane. W dniu ... | |||
23-0127A0002323R.PL-00064_001 | 2023-01-27 06:57:51 | 2023-01-31 17:15 | 2023-01-31 20:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych SEPS w dni... | |||
22-0526A0002323R.PL-00241_001 | 2022-05-26 06:59:56 | 2022-06-01 20:30 | 2022-06-01 22:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO (pełn... | |||
22-0614A0002323R.PL-00272_002 | 2022-06-15 04:49:05 | 2022-06-14 19:40 | 2022-06-14 22:27 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na problemy techniczne systemów informatycznych Nord Pool w dniu 14.06.... | |||
23-0214A0002323R.PL-00082_001 | 2023-02-14 07:49:21 | 2023-02-21 17:55 | 2023-02-21 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-1018A0002323R.PL-00488_001 | 2022-10-18 06:42:18 | 2022-10-25 16:55 | 2022-10-25 19:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
23-0301A0002323R.PL-00108_001 | 2023-03-01 08:19:09 | 2023-03-06 17:55 | 2023-03-06 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane pilne prace modernizacyjne systemów informatycznych PSE ... | |||
22-0808A0002323R.PL-00364_001 | 2022-08-08 11:31:38 | 2022-08-15 06:30 | 2022-08-15 07:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO (pełn... | |||
22-0817A0002323R.PL-00374_001 | 2022-08-17 05:38:59 | 2022-08-23 17:30 | 2022-08-23 21:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
23-0112A0002323R.PL-00019_001 | 2023-01-12 10:47:55 | 2023-01-18 07:55 | 2023-01-18 11:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych DBAG w dni... | |||
22-1222A0001079H.PL-00635_001 | 2022-12-22 08:48:02 | 2023-01-01 05:00 | 2024-01-01 04:59 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | The President of the ERO approved on 16.12.2022 “Tariff No 8 for LNG regasification services o... | |||
23-0103A0002323R.PL-00003_001 | 2023-01-03 14:48:21 | 2023-01-10 07:30 | 2023-01-10 09:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO w dni... | |||
22-0606A0001079H.PL-00254_003 | 2022-12-16 14:16:22 | 2023-01-01 05:00 | 2024-01-01 04:59 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | The President of the ERO approved on 15.12.2022 “Tariff for Transmission of Gaseous Fuels No. 16”... | |||
22-1110A0001079H.PL-00571_001 | 2022-11-10 12:59:50 | 2022-11-10 13:00 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | GAZ-SYSTEM S.A. herby informs that capacity of the new interconnection point on the border betwee... | ||||
23-0116A0001943E.PL-00024_002 | 2023-01-16 12:55:36 | 2023-01-16 11:20 | Active | OTHER | PGNiG TERMIKA SA A0001943E.PL [ace] | Ograniczenia zdolności konsumpcji gazu występujące w zakładzie EC Żerań będą odtąd publikowane z ... | ||||
23-0116A0002323R.PL-00033_001 | 2023-01-16 13:41:26 | 2023-01-23 21:30 | 2023-01-24 00:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO (pełn... | |||
22-1007A0002323R.PL-00478_001 | 2022-10-07 21:19:40 | 2022-10-11 17:40 | 2022-10-11 20:15 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EPEX/ECC S... | |||
23-0124A0002323R.PL-00039_001 | 2023-01-24 20:50:50 | 2023-01-24 20:30 | 2023-01-24 21:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje o nieplanowanym zawieszeniu procesu Jednolitego łączenia Rynku Dnia Bieżącego w dni... | |||
23-0201A0002323R.PL-00075_001 | 2023-02-01 10:09:07 | 2023-02-08 08:00 | 2023-02-08 09:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO w dni... | |||
22-1213A0002323R.PL-00620_001 | 2022-12-13 10:17:03 | 2022-12-20 18:30 | 2022-12-20 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
23-0206A0002323R.PL-00079_001 | 2023-02-06 10:46:57 | 2023-02-07 17:15 | 2023-02-07 18:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje o planowanym zawieszeniu procesu Jednolitego łączenia Rynku Dnia Bieżącego w dniu 0... | |||
22-0902A0002323R.PL-00412_001 | 2022-09-02 14:34:11 | 2022-09-02 16:34 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE S.A., acting as Auction Office, informs that on 2nd September 2022 starts the unilateral auct... | ||||
23-0310A0002323R.PL-00132_001 | 2023-03-10 10:53:35 | 2023-03-13 17:15 | 2023-03-13 21:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych SEPS w dni... | |||
22-1209A0002323R.PL-00619_001 | 2022-12-09 06:28:57 | 2022-12-13 17:15 | 2022-12-13 21:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych SEPS w dni... | |||
22-0524A0002323R.PL-00234_001 | 2022-05-24 06:09:14 | 2022-05-25 06:30 | 2022-05-25 08:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO / NOR... | |||
23-0314A0002323R.PL-00137_001 | 2023-03-14 11:38:57 | 2023-03-21 17:55 | 2023-03-21 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-1115A0002323R.PL-00575_001 | 2022-11-15 08:58:45 | 2022-11-22 17:55 | 2022-11-22 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0531A0002323R.PL-00248_001 | 2022-05-31 09:15:00 | 2022-06-07 12:50 | 2022-06-07 17:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych PSE w dniu... | |||
22-0601A0002323R.PL-00251_001 | 2022-06-01 12:54:02 | 2022-06-07 18:00 | 2022-06-07 22:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych PSE w okre... | |||
22-0923A0002323R.PL-00440_001 | 2022-09-23 08:59:32 | 2022-09-23 17:00 | 2022-09-23 19:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | Komunikat o ogłoszeniu okresów zagrożeniaPolskie Sieci Elektroenergetyczne S.A. ogłaszają okr... | |||
22-1116A0002323R.PL-00578_001 | 2022-11-16 10:50:19 | 2022-11-24 07:55 | 2022-11-24 10:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych DBAG (oper... | |||
22-1102A0002323R.PL-00561_001 | 2022-11-02 07:16:51 | 2022-11-08 18:40 | 2022-11-08 22:15 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EPEX/ECC (... | |||
22-1102A0002323R.PL-00562_001 | 2022-11-02 11:27:58 | 2022-11-01 18:35 | Active | OTHER | PSE SA A0002323R.PL [ace] | PSE informują, że wznowiona została publikacja UMM dot. niedostępności infrastruktury sieciowej o... | ||||
22-0617A0002323R.PL-00276_001 | 2022-06-17 10:56:30 | 2022-06-30 07:55 | 2022-06-30 08:50 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych DBAG w dni... | |||
22-0927A0002323R.PL-00450_001 | 2022-09-27 09:37:30 | 2022-10-05 07:55 | 2022-10-05 08:50 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych DBAG w dni... | |||
22-1118A0002323R.PL-00584_002 | 2022-11-29 11:44:29 | 2022-11-29 08:55 | 2022-11-29 12:42 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych PSE w dniu... | |||
22-1129A0002323R.PL-00592_001 | 2022-11-29 06:05:09 | 2022-12-05 21:30 | 2022-12-06 00:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EMCO (pełn... | |||
23-0328A0002323R.PL-00151_001 | 2023-03-28 06:35:14 | 2023-04-04 17:30 | 2023-04-04 18:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0714A0001079H.PL-00315_001 | 2022-07-14 17:58:01 | 2022-07-14 18:57 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | GAZ-SYSTEM S.A. hereby informs that technical capacity for following points:- Kondratki entry (... | ||||
21-0604A0001079H.PL-00058_002 | 2022-07-14 18:24:45 | 2021-06-04 06:23 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | GAZ-SYSTEM S.A. herby informs that technical capacity for following points:- GCP GAZ-SYSTEM/ONT... | ||||
22-0725A0002323R.PL-00326_001 | 2022-07-25 07:24:03 | 2022-07-26 16:55 | 2022-07-26 19:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-0913A0002323R.PL-00421_001 | 2022-09-13 06:28:04 | 2022-09-20 16:55 | 2022-09-20 19:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
22-1108A0002323R.PL-00568_001 | 2022-11-08 10:42:34 | 2022-11-09 17:55 | 2022-11-09 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane w trybie pilnym prace modernizacyjne systemów informatyc... | |||
22-1118A0002323R.PL-00585_001 | 2022-11-18 12:18:54 | 2022-11-28 17:00 | 2022-11-28 23:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że mechanizm alokacji explicit intraday na granicy SEPS-PSE (Słowacja-Polska) od d... | |||
22-1003A0001079H.PL-00464_001 | 2022-10-03 13:10:59 | 2022-10-03 13:10 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | GAZ-SYSTEM S.A. hereby informs that the capacity at FAXE (EIC 21Z000000000509H) exit point (ID: 7... | ||||
22-1006A0002323R.PL-00472_001 | 2022-10-06 19:47:02 | 2022-10-11 17:40 | 2022-10-11 20:15 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EPEX/ECC S... | |||
23-0317A0002323R.PL-00140_001 | 2023-03-17 08:37:56 | 2023-03-22 08:55 | 2023-03-22 09:45 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych DBAG w dni... | |||
22-1219A0001079H.PL-00627_001 | 2022-12-19 12:28:09 | 2023-01-01 05:00 | 2024-01-01 04:59 | Active | OTHER | GAZ-SYSTEM S.A. A0001079H.PL [ace] | The President of the ERO approved on 16.12.2022 “Tariff No 1/2023 for gaseous fuels transmission... | |||
22-0906A0002323R.PL-00415_001 | 2022-09-06 09:17:29 | 2022-09-13 17:40 | 2022-09-13 19:45 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych EPEX (pełn... | |||
23-0106A0002323R.PL-00013_001 | 2023-01-06 08:20:32 | 2023-01-06 06:45 | 2023-01-06 07:27 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje o nieplanowanym zawieszeniu procesu Jednolitego łączenia Rynku Dnia Bieżącego w dni... | |||
23-0302A0002323R.PL-00119_001 | 2023-03-02 13:38:57 | 2023-03-07 17:15 | 2023-03-07 21:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych SEPS w dni... | |||
23-0117A0002323R.PL-00035_001 | 2023-01-17 07:25:44 | 2023-01-24 17:55 | 2023-01-24 20:30 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych CEPS w dni... | |||
23-0216A0002323R.PL-00088_001 | 2023-02-16 13:52:18 | 2023-02-21 17:15 | 2023-02-21 20:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych SEPS w dni... | |||
22-1028A0002323R.PL-00501_001 | 2022-10-28 17:05:00 | 2022-11-01 19:00 | 2022-11-01 23:00 | Active | OTHER | PSE SA A0002323R.PL [ace] | OSP informuje, że z uwagi na zaplanowane prace modernizacyjne systemów informatycznych SEPS w okr... | |||
22-1103A0003319F.PL-00564_001 | 2022-11-03 09:54:03 | 2023-07-03 04:00 | 2023-07-31 14:00 | Active | GAS | PKN Orlen SA A0003319F.PL [ace] | [53ZPL0000772311M] Nitrogen Rejection Plant Grodzisk [Entry] | 440 000 [kWh/h] | ||
23-0124A0001943E.PL-00037_003 | 2023-01-25 09:10:43 | 2023-12-31 23:01 | 2024-02-29 23:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 151 000 [kWh/h] | ||
23-0124A0001943E.PL-00038_002 | 2023-01-25 09:14:57 | 2024-02-29 23:01 | 2024-04-02 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | ||
23-0125A0001943E.PL-00041_002 | 2023-01-25 09:46:52 | 2024-04-02 22:01 | 2024-06-13 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | ||
23-0125A0001943E.PL-00051_001 | 2023-01-25 12:46:36 | 2024-04-20 22:01 | 2024-07-02 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 755 000 [kWh/h] | ||
23-0125A0001943E.PL-00052_001 | 2023-01-25 12:55:05 | 2024-07-02 22:01 | 2024-07-18 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | ||
23-0126A0001943E.PL-00055_001 | 2023-01-26 09:45:29 | 2024-07-18 22:01 | 2024-07-21 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 604 000 [kWh/h] | ||
23-0126A0001943E.PL-00059_001 | 2023-01-26 10:03:43 | 2024-08-08 22:01 | 2024-08-27 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 302 000 [kWh/h] | ||
23-0105A0002235O.PL-00011_001 | 2023-01-05 14:01:15 | 2023-05-26 04:00 | 2023-08-01 04:00 | Active | GAS | Grupa Azoty Puławy SA A0002235O.PL [ace] | [53ZPL0000109018W] Grupa Azoty Zakłady Azotowe "Puławy" S.A. [Exit] | 407 000 [kWh/h] | ||
23-0116A0001943E.PL-00026_002 | 2023-02-14 09:50:20 | 2023-05-06 22:01 | 2023-05-22 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0111A0003319F.PL-00018_001 | 2023-01-11 11:22:15 | 2023-06-30 21:01 | 2023-07-31 22:00 | Active | GAS | PKN Orlen SA A0003319F.PL [ace] | [53ZPL00005902030] CCGT_PŁOCK [Exit] | 1 506 600 [kWh/h] | ||
23-0214A0001943E.PL-00084_001 | 2023-02-14 09:53:56 | 2023-05-22 22:01 | 2023-05-30 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 309 000 [kWh/h] | ||
23-0116A0001943E.PL-00028_001 | 2023-01-16 12:07:56 | 2023-07-09 22:01 | 2023-07-14 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 158 000 [kWh/h] | ||
23-0116A0001943E.PL-00027_003 | 2023-02-14 09:54:53 | 2023-05-30 22:01 | 2023-07-09 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | ||
23-0222A0001943E.PL-00090_002 | 2023-02-22 11:57:12 | 2023-02-22 06:46 | 2023-02-22 13:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 309 000 [kWh/h] | ||
23-0125A0001943E.PL-00049_001 | 2023-01-25 09:55:23 | 2024-06-13 22:01 | 2024-06-20 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 302 000 [kWh/h] | ||
23-0126A0001943E.PL-00056_001 | 2023-01-26 09:49:39 | 2024-07-21 22:01 | 2024-07-28 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | ||
23-0126A0001943E.PL-00057_001 | 2023-01-26 09:56:02 | 2024-07-28 22:01 | 2024-08-04 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 302 000 [kWh/h] | ||
23-0126A0001943E.PL-00058_001 | 2023-01-26 09:59:55 | 2024-08-04 22:01 | 2024-08-08 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | ||
23-0126A0001943E.PL-00060_001 | 2023-01-26 10:07:53 | 2024-08-27 22:01 | 2024-12-30 23:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | ||
23-0222A0001943E.PL-00091_004 | 2023-02-27 07:23:05 | 2023-02-22 13:01 | 2023-02-28 08:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0329A0001943E.PL-00154_001 | 2023-03-29 08:16:41 | 2023-03-30 05:01 | 2023-03-31 13:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 663 000 [kWh/h] | ||
23-0116A0001943E.PL-00025_003 | 2023-03-30 14:20:06 | 2023-04-07 09:01 | 2023-05-06 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 309 000 [kWh/h] | ||
23-0330A0001943E.PL-00162_001 | 2023-03-30 14:28:24 | 2023-04-04 02:01 | 2023-04-07 09:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | ||
23-0329A0001943E.PL-00155_001 | 2023-03-29 08:19:20 | 2023-03-31 13:01 | 2023-03-31 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0309A0001943E.PL-00131_004 | 2023-03-29 08:59:50 | 2023-03-22 12:01 | 2023-03-29 08:47 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0329A0001943E.PL-00157_002 | 2023-03-29 10:51:10 | 2023-03-29 12:01 | 2023-03-30 05:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0329A0001943E.PL-00156_002 | 2023-03-29 10:51:43 | 2023-03-29 08:48 | 2023-03-29 12:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 309 000 [kWh/h] | ||
23-0328A0003319F.PL-00152_001 | 2023-03-28 09:36:07 | 2023-09-07 22:01 | 2023-09-14 10:00 | Active | GAS | PKN Orlen SA A0003319F.PL [ace] | [53ZPL0000690954M] CCGT WŁOCŁAWEK [Exit] | 894 800 [kWh/h] | ||
23-0314A0001943E.PL-00138_001 | 2023-03-14 22:51:16 | 2023-03-14 21:55 | 2023-03-14 23:30 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 000 099 [kWh/h] | ||
23-0310A0001943E.PL-00134_002 | 2023-03-14 22:57:20 | 2023-03-14 23:31 | 2023-03-19 23:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0330A0001943E.PL-00161_001 | 2023-03-30 14:26:13 | 2023-03-31 22:01 | 2023-04-04 02:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 309 000 [kWh/h] | ||
23-0116A0002235O.PL-00034_008 | 2023-03-30 15:07:09 | 2023-01-17 12:15 | 2023-04-10 04:00 | Active | GAS | Grupa Azoty Puławy SA A0002235O.PL [ace] | [53ZPL0000109018W] Grupa Azoty Zakłady Azotowe "Puławy" S.A. | 755 000 [kWh/h] | ||
23-0116A0001943E.PL-00030_002 | 2023-03-16 11:03:39 | 2023-07-30 22:01 | 2023-12-31 23:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | ||
23-0324A0003247I.PL-00150_004 | 2023-03-31 15:27:00 | 2023-03-24 20:00 | 2023-04-03 10:00 | Active | GAS | Grupa Azoty Kędzierzyn SA A0003247I.PL [ace] | [53XPL000000ZAKED] Grupa Azoty ZAK S.A. [Exit] | 671 400 [kWh/h] | ||
23-0222A0002835C.PL-00092_004 | 2023-04-02 04:21:02 | 2023-02-22 09:35 | 2023-04-03 18:00 | Active | GAS | Grupa Azoty Police SA A0002835C.PL [ace] | [53ZPL00007902368] Grupa Azoty Zakłady Chemiczne Police S.A. [Exit] | 785 000 [kWh/h] | Balance event | |
23-0309A0001943E.PL-00130_003 | 2023-03-20 12:34:50 | 2023-03-22 10:01 | 2023-03-22 12:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 009 000 [kWh/h] | ||
23-0302A0001943E.PL-00109_001 | 2023-03-02 11:30:18 | 2024-12-31 23:01 | 2025-05-15 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | ||
23-0310A0001943E.PL-00133_002 | 2023-03-14 22:47:28 | 2023-03-12 23:01 | 2023-03-14 21:54 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 663 000 [kWh/h] | ||
23-0116A0001943E.PL-00029_004 | 2023-03-16 10:59:47 | 2023-07-14 22:01 | 2023-07-21 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 762 000 [kWh/h] | ||
23-0228A0001943E.PL-00107_001 | 2023-02-28 08:58:28 | 2023-03-01 18:01 | 2023-03-02 18:01 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 316 000 [kWh/h] | ||
23-0227A0001943E.PL-00101_004 | 2023-02-28 08:59:04 | 2023-02-28 09:01 | 2023-03-01 12:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 361 000 [kWh/h] | ||
23-0302A0001943E.PL-00111_001 | 2023-03-02 11:36:00 | 2025-06-01 22:01 | 2025-06-13 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 453 000 [kWh/h] | ||
23-0302A0001943E.PL-00115_001 | 2023-03-02 11:44:45 | 2025-07-15 22:01 | 2025-07-30 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 007 000 [kWh/h] | ||
23-0227A0001943E.PL-00102_001 | 2023-02-27 07:22:00 | 2023-03-02 18:01 | 2023-03-03 08:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | ||
23-0302A0001943E.PL-00116_001 | 2023-03-02 11:46:46 | 2025-07-30 22:01 | 2025-08-29 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | ||
23-0302A0001943E.PL-00117_001 | 2023-03-02 11:48:01 | 2025-08-29 22:01 | 2025-10-03 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 302 000 [kWh/h] | ||
23-0302A0001943E.PL-00118_001 | 2023-03-02 11:49:15 | 2025-10-03 22:01 | 2025-12-31 23:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 276 000 [kWh/h] | ||
23-0309A0001943E.PL-00129_001 | 2023-03-09 12:05:47 | 2023-03-20 14:01 | 2023-03-22 10:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0227A0001943E.PL-00103_003 | 2023-03-10 11:09:59 | 2023-03-03 08:01 | 2023-03-12 23:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0316A0001943E.PL-00139_001 | 2023-03-16 11:08:14 | 2023-07-21 22:01 | 2023-07-30 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 755 000 [kWh/h] | ||
23-0228A0001943E.PL-00106_001 | 2023-02-28 08:52:40 | 2023-03-01 12:01 | 2023-03-01 18:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 512 000 [kWh/h] | ||
23-0302A0001943E.PL-00110_001 | 2023-03-02 11:32:08 | 2025-05-15 22:01 | 2025-06-01 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 302 000 [kWh/h] | ||
23-0302A0001943E.PL-00112_001 | 2023-03-02 11:38:23 | 2025-06-13 22:01 | 2025-06-15 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 460 000 [kWh/h] | ||
23-0302A0001943E.PL-00113_001 | 2023-03-02 11:40:56 | 2025-06-15 22:01 | 2025-06-30 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 309 000 [kWh/h] | ||
23-0302A0001943E.PL-00114_001 | 2023-03-02 11:43:03 | 2025-06-30 22:01 | 2025-07-15 22:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 158 000 [kWh/h] | ||
23-0309A0001943E.PL-00128_002 | 2023-03-13 06:44:31 | 2023-03-20 10:01 | 2023-03-20 14:00 | Active | GAS | PGNiG TERMIKA SA A0001943E.PL [ace] | [19W000000000229Z] EC Żerań | 1 009 000 [kWh/h] | ||
22-0310A0002323R.PL-00044_001 | 2022-03-10 05:48:13 | 2022-03-11 18:00 | 2022-03-11 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-0311A0002323R.PL-00051_001 | 2022-03-11 15:25:01 | 2022-03-07 06:00 | 2022-03-11 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
22-0311A0002323R.PL-00050_003 | 2022-03-15 06:04:32 | 2022-03-16 06:00 | 2022-03-25 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
22-0309A0002323R.PL-00040_001 | 2022-03-09 05:43:52 | 2022-03-07 06:00 | 2022-03-11 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
22-0315A0002323R.PL-00060_001 | 2022-03-15 10:42:45 | 2022-03-28 05:00 | 2022-04-01 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] KRA44-VIE40 | 1 039 [MW] | Utrzymanie | |
22-0315A0002323R.PL-00067_001 | 2022-03-15 10:45:46 | 2022-03-28 05:00 | 2022-04-01 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] KRA44-VIE40 | 1 039 [MW] | Utrzymanie | |
22-0315A0002323R.PL-00071_001 | 2022-03-15 10:46:04 | 2022-04-01 04:00 | 2022-04-04 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0315A0002323R.PL-00062_001 | 2022-03-15 10:43:03 | 2022-04-29 17:00 | 2022-12-31 23:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] KRA44-VIE40 | 1 039 [MW] | Inne | |
22-0315A0002323R.PL-00064_001 | 2022-03-15 10:43:03 | 2022-04-25 05:00 | 2022-04-29 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000039] VIE40-KRA44 | 1 039 [MW] | Utrzymanie | |
22-1028A0002323R.PL-00499_001 | 2022-10-28 12:35:05 | 2022-11-02 05:00 | 2022-11-04 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013155] CRN44-PAS44 | 1 150 [MW] 1 150 [MW] 1 150 [MW] | Utrzymanie | |
22-0315A0002323R.PL-00075_001 | 2022-03-15 10:46:21 | 2022-04-27 05:00 | 2022-04-29 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0317A0002323R.PL-00079_001 | 2022-03-17 06:53:42 | 2022-03-18 14:00 | 2022-03-18 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0317A0002323R.PL-00082_001 | 2022-03-17 13:04:12 | 2022-03-19 21:00 | 2022-03-20 02:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0317A0002323R.PL-00078_001 | 2022-03-17 05:50:24 | 2022-03-18 05:00 | 2022-03-22 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0325A0002323R.PL-00101_001 | 2022-03-25 15:16:26 | 2022-04-25 05:00 | 2022-04-28 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006388R] WIE43-JOA43 | 1 386 [MW] | Utrzymanie | |
22-0320A0002323R.PL-00088_001 | 2022-03-20 06:27:09 | 2022-03-21 14:00 | 2022-03-21 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0321A0002323R.PL-00090_001 | 2022-03-21 06:58:58 | 2022-03-22 14:00 | 2022-03-22 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0321A0002323R.PL-00091_001 | 2022-03-21 06:59:57 | 2022-03-22 14:00 | 2022-03-22 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0324A0002323R.PL-00098_001 | 2022-03-24 13:35:08 | 2022-03-26 16:00 | 2022-03-26 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0325A0002323R.PL-00102_001 | 2022-03-25 15:16:32 | 2022-04-15 07:00 | 2022-04-15 08:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006388R] WIE43-JOA43 | 1 386 [MW] | Utrzymanie | |
22-0320A0002323R.PL-00089_001 | 2022-03-20 06:28:11 | 2022-03-21 16:00 | 2022-03-21 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0325A0002323R.PL-00100_001 | 2022-03-25 15:16:21 | 2022-04-01 17:00 | 2022-04-25 05:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] KRA44-VIE40 | 1 039 [MW] | Inne | |
22-0325A0002323R.PL-00104_001 | 2022-03-25 15:16:45 | 2022-04-02 05:00 | 2022-04-02 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-0327A0002323R.PL-00112_003 | 2022-03-27 12:59:36 | 2022-03-27 08:00 | 2022-03-27 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Awaria | |
22-0328A0002323R.PL-00114_001 | 2022-03-28 05:59:01 | 2022-03-29 14:00 | 2022-03-29 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Modernizacja | |
22-0325A0002323R.PL-00110_002 | 2022-03-28 11:29:17 | 2022-03-28 08:00 | 2022-04-01 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] KRA44-VIE40 | 1 039 [MW] | Utrzymanie | |
22-0309A0002323R.PL-00039_002 | 2022-03-28 11:29:50 | 2022-01-09 23:00 | 2022-03-28 08:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000039] VIE40-KRA44 | 1 039 [MW] | Utrzymanie | |
22-0328A0002323R.PL-00113_002 | 2022-03-30 12:20:41 | 2022-03-28 05:00 | 2022-04-01 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Modernizacja | |
22-0315A0002323R.PL-00070_003 | 2022-04-01 09:02:29 | 2022-03-31 22:00 | 2022-04-04 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0401A0002323R.PL-00123_001 | 2022-04-01 10:14:14 | 2022-04-03 05:00 | 2022-04-03 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-0404A0002323R.PL-00126_001 | 2022-04-04 04:46:39 | 2022-04-05 05:00 | 2022-04-05 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Utrzymanie | |
22-0329A0002323R.PL-00117_001 | 2022-03-29 05:51:00 | 2022-03-30 04:00 | 2022-03-30 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Modernizacja | |
22-0315A0002323R.PL-00066_003 | 2022-04-05 04:37:07 | 2022-04-04 05:00 | 2022-04-05 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004057N] MIK44_MIK24_AT-1 | 550 [MW] 550 [MW] | Utrzymanie | |
22-0325A0002323R.PL-00103_002 | 2022-04-13 04:41:05 | 2022-04-14 10:00 | 2022-04-14 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006388R] WIE43-JOA43 | 1 386 [MW] | Utrzymanie | |
22-0413A0002323R.PL-00146_001 | 2022-04-13 05:49:21 | 2022-04-14 07:00 | 2022-04-14 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0401A0002323R.PL-00124_004 | 2022-04-11 10:49:35 | 2022-04-04 06:00 | 2022-04-11 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00002E] BUJ23-LIS20 | 400 [MW] | Utrzymanie | |
22-0420A0002323R.PL-00152_001 | 2022-04-20 14:13:30 | 2022-04-22 06:00 | 2022-04-22 08:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0315A0002323R.PL-00065_005 | 2022-04-22 16:08:43 | 2022-04-19 05:00 | 2022-04-22 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00004A] WIE43-NOS40 | 1 386 [MW] | Utrzymanie | |
22-0424A0002323R.PL-00156_001 | 2022-04-24 05:26:10 | 2022-04-25 16:00 | 2022-04-25 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-0315A0002323R.PL-00072_004 | 2022-04-13 20:07:14 | 2022-04-09 05:00 | 2022-04-13 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-00001D] HAG40-MIK44 | 1 732 [MW] | Utrzymanie | |
22-0414A0002323R.PL-00148_001 | 2022-04-14 06:49:49 | 2022-04-14 06:00 | 2022-04-14 06:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Awaria | |
22-0414A0002323R.PL-00147_002 | 2022-04-14 07:08:02 | 2022-04-15 05:00 | 2022-04-15 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013244] PLE44-KRA44 | 1 386 [MW] | Utrzymanie | |
22-0315A0002323R.PL-00059_007 | 2022-04-15 13:53:40 | 2022-04-11 05:00 | 2022-04-15 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-0415A0002323R.PL-00149_001 | 2022-04-15 16:46:51 | 2022-04-17 08:00 | 2022-04-17 10:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0418A0002323R.PL-00150_001 | 2022-04-18 05:08:34 | 2022-04-19 16:00 | 2022-04-19 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-0425A0002323R.PL-00157_001 | 2022-04-25 05:24:49 | 2022-04-25 05:00 | 2022-04-26 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006388R] WIE43-JOA43 | 1 386 [MW] | Utrzymanie | |
22-0425A0002323R.PL-00158_001 | 2022-04-25 05:54:52 | 2022-04-26 16:00 | 2022-04-26 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-0426A0002323R.PL-00162_001 | 2022-04-26 05:48:08 | 2022-04-27 16:00 | 2022-04-27 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-0309A0002323R.PL-00042_006 | 2022-04-25 13:41:24 | 2022-02-03 13:00 | 2022-04-30 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Utrzymanie | |
22-0426A0002323R.PL-00164_001 | 2022-04-26 10:38:50 | 2022-05-02 05:00 | 2022-05-06 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] KRA44-VIE40 | 1 039 [MW] | Utrzymanie | |
22-0426A0002323R.PL-00167_001 | 2022-04-26 10:39:40 | 2022-04-29 17:00 | 2022-05-02 05:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000039] VIE40-KRA44 | 1 039 [MW] | Utrzymanie | |
22-0428A0002323R.PL-00180_001 | 2022-04-28 06:08:05 | 2022-04-29 15:00 | 2022-04-29 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-0429A0002323R.PL-00181_001 | 2022-04-29 05:41:02 | 2022-04-30 05:00 | 2022-04-30 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006430T] GDP45-GBL45 | 831 [MW] | Utrzymanie | |
22-0429A0002323R.PL-00183_001 | 2022-04-29 05:41:36 | 2022-04-30 05:00 | 2022-04-30 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013325] GDA45-GBL45 | 831 [MW] | Utrzymanie | |
22-0426A0002323R.PL-00166_002 | 2022-05-01 04:10:46 | 2022-05-02 05:00 | 2022-05-06 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000039] VIE40-KRA44 | 1 039 [MW] | Utrzymanie | |
22-0427A0002323R.PL-00172_001 | 2022-04-27 05:51:06 | 2022-04-28 16:00 | 2022-04-28 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-0429A0002323R.PL-00182_001 | 2022-04-29 05:41:20 | 2022-04-30 05:00 | 2022-04-30 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006431R] GDP45-ZRC45 | 831 [MW] | Utrzymanie | |
22-1005A0002323R.PL-00468_004 | 2022-11-17 06:44:44 | 2022-11-14 05:00 | 2022-11-16 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
22-0404A0002323R.PL-00130_003 | 2022-04-26 11:22:37 | 2022-05-14 05:00 | 2022-05-20 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0428A0002323R.PL-00177_001 | 2022-04-28 06:07:15 | 2022-04-29 04:00 | 2022-04-29 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013325] GDA45-GBL45 | 831 [MW] | Utrzymanie | |
22-0426A0002323R.PL-00170_002 | 2022-05-12 12:36:40 | 2022-05-09 05:00 | 2022-05-12 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000378N] CPC24-MIK24 | 427 [MW] 427 [MW] 427 [MW] 427 [MW] | Utrzymanie | |
22-0428A0002323R.PL-00178_001 | 2022-04-28 06:07:34 | 2022-04-29 04:00 | 2022-04-29 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006430T] GDP45-GBL45 | 831 [MW] | Utrzymanie | |
22-0428A0002323R.PL-00179_001 | 2022-04-28 06:07:50 | 2022-04-29 04:00 | 2022-04-29 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006431R] GDP45-ZRC45 | 831 [MW] | Utrzymanie | |
22-0405A0002323R.PL-00136_002 | 2022-05-02 19:01:13 | 2022-05-04 05:00 | 2022-05-04 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] KOP23-LIS20 | 400 [MW] | Utrzymanie | |
22-0504A0002323R.PL-00185_001 | 2022-05-04 05:49:36 | 2022-05-05 14:00 | 2022-05-05 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-0505A0002323R.PL-00189_001 | 2022-05-05 05:46:33 | 2022-05-06 17:00 | 2022-05-06 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-0505A0002323R.PL-00190_001 | 2022-05-05 13:45:35 | 2022-05-07 14:00 | 2022-05-07 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0501A0002323R.PL-00184_004 | 2022-05-01 08:28:52 | 2022-05-01 03:00 | 2022-05-01 08:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000037] ALY40-EKB41 | 500 [MW] | Awaria | |
22-0425A0002323R.PL-00159_003 | 2022-05-06 14:40:41 | 2022-04-30 22:00 | 2022-05-06 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Utrzymanie | |
22-0506A0002323R.PL-00193_001 | 2022-05-06 14:43:29 | 2022-05-06 14:00 | 2022-05-16 04:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Utrzymanie | |
22-0426A0002323R.PL-00171_003 | 2022-05-11 08:57:30 | 2022-05-07 04:00 | 2022-05-12 07:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Modernizacja | |
22-0801A0002323R.PL-00346_002 | 2022-09-29 15:57:45 | 2022-09-26 05:00 | 2022-09-28 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
22-0509A0002323R.PL-00196_001 | 2022-05-09 11:38:24 | 2022-05-12 06:00 | 2022-05-12 07:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0506A0002323R.PL-00192_003 | 2022-05-12 17:44:49 | 2022-05-06 14:00 | 2022-05-12 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000039] VIE40-KRA44 | 1 039 [MW] | Utrzymanie | |
22-0311A0002323R.PL-00046_003 | 2022-05-15 09:47:05 | 2022-05-15 05:00 | 2022-05-16 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004058L] MIK44_MIK24_AT-2 | 550 [MW] 550 [MW] | Utrzymanie | |
22-0426A0002323R.PL-00169_003 | 2022-05-18 12:15:48 | 2022-05-19 04:00 | 2022-05-20 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Modernizacja | |
22-0518A0002323R.PL-00223_001 | 2022-05-18 12:28:10 | 2022-05-20 10:00 | 2022-05-20 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Utrzymanie | |
22-0515A0002323R.PL-00220_001 | 2022-05-15 09:49:46 | 2022-05-17 05:00 | 2022-05-17 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004058L] MIK44_MIK24_AT-2 | 550 [MW] | Utrzymanie | |
22-0515A0002323R.PL-00221_002 | 2022-05-20 11:32:20 | 2022-05-18 05:00 | 2022-05-19 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004058L] MIK44_MIK24_AT-2 | 550 [MW] 550 [MW] | Utrzymanie | |
22-0520A0002323R.PL-00225_001 | 2022-05-20 11:35:57 | 2022-05-20 05:00 | 2022-05-20 10:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004058L] MIK44_MIK24_AT-2 | 550 [MW] | Utrzymanie | |
22-0524A0002323R.PL-00233_001 | 2022-05-24 05:45:11 | 2022-05-25 16:00 | 2022-05-25 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0425A0002323R.PL-00161_003 | 2022-05-21 09:16:23 | 2022-05-16 04:00 | 2022-05-21 09:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000037] ALY40-EKB41 | 500 [MW] | Utrzymanie | |
22-0523A0002323R.PL-00229_001 | 2022-05-23 05:24:35 | 2022-05-24 07:00 | 2022-05-24 10:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Utrzymanie | |
22-0521A0002323R.PL-00226_003 | 2022-05-23 13:10:07 | 2022-05-23 05:00 | 2022-05-23 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004057N] MIK44_MIK24_AT-1 | 550 [MW] | Utrzymanie | |
22-0521A0002323R.PL-00227_001 | 2022-05-21 18:40:39 | 2022-05-23 08:00 | 2022-05-23 10:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0523A0002323R.PL-00230_002 | 2022-05-24 17:27:48 | 2022-05-24 05:00 | 2022-05-24 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004057N] MIK44_MIK24_AT-1 | 550 [MW] | Utrzymanie | |
22-0524A0002323R.PL-00231_003 | 2022-05-25 10:46:27 | 2022-05-25 10:00 | 2022-05-25 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Utrzymanie | |
22-0725A0002323R.PL-00337_002 | 2022-08-08 05:49:20 | 2022-08-02 05:00 | 2022-08-11 05:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-0727A0002323R.PL-00342_001 | 2022-07-27 05:54:51 | 2022-07-28 14:00 | 2022-07-28 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Modernizacja | |
22-0909A0002323R.PL-00420_004 | 2022-09-15 19:14:48 | 2022-09-12 05:00 | 2022-09-15 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006437F] PAS44-MIK44 | 1 386 [MW] | Utrzymanie | |
22-0730A0002323R.PL-00344_001 | 2022-07-30 06:21:47 | 2022-07-30 03:00 | 2022-07-30 03:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00004A] WIE43-NOS40 | 1 386 [MW] | Awaria | |
22-0725A0002323R.PL-00340_003 | 2022-08-06 14:18:09 | 2022-08-06 08:00 | 2022-08-06 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0624A0002323R.PL-00289_002 | 2022-07-12 04:53:11 | 2022-07-13 06:00 | 2022-07-23 05:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-0819A0002323R.PL-00379_001 | 2022-08-19 07:35:30 | 2022-08-21 04:00 | 2022-08-21 05:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0708A0002323R.PL-00308_007 | 2022-07-12 14:15:38 | 2022-07-10 04:00 | 2022-07-12 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Modernizacja | |
22-0716A0002323R.PL-00319_001 | 2022-07-16 11:25:57 | 2022-07-17 05:00 | 2022-07-17 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0819A0002323R.PL-00378_002 | 2022-08-22 12:37:46 | 2022-08-20 03:00 | 2022-08-22 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0625A0002323R.PL-00290_001 | 2022-06-25 09:50:43 | 2022-07-16 05:00 | 2022-07-17 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000372Z] SWI24-MIK24 | 362 [MW] 362 [MW] | Utrzymanie | |
22-0701A0002323R.PL-00297_003 | 2022-07-05 07:18:55 | 2022-07-06 07:00 | 2022-07-08 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006410N] POL24-LES24 | 377 [MW] | Utrzymanie | |
22-0819A0002323R.PL-00377_002 | 2022-08-22 12:38:41 | 2022-08-20 03:00 | 2022-08-22 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006410N] POL24-LES24 | 377 [MW] | Utrzymanie | |
22-0705A0002323R.PL-00302_004 | 2022-08-23 16:14:02 | 2022-08-22 05:00 | 2022-08-23 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00004A] WIE43-NOS40 | 1 386 [MW] | Utrzymanie | |
22-0703A0002323R.PL-00299_001 | 2022-07-03 04:55:28 | 2022-07-04 04:00 | 2022-07-07 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000377P] DBN43-PAS44 | 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] | Utrzymanie | |
22-0802A0002323R.PL-00358_003 | 2022-08-30 12:28:28 | 2022-09-01 03:00 | 2022-09-07 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006410N] POL24-LES24 | 377 [MW] | Utrzymanie | |
22-0902A0002323R.PL-00409_002 | 2022-09-09 11:39:24 | 2022-09-05 05:00 | 2022-09-09 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00001W] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
22-0902A0002323R.PL-00406_001 | 2022-09-02 05:45:33 | 2022-09-01 08:00 | 2022-09-30 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-0527A0002323R.PL-00247_002 | 2022-05-29 07:20:07 | 2022-05-28 05:00 | 2022-05-28 07:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0802A0002323R.PL-00355_003 | 2022-08-30 12:28:46 | 2022-09-01 03:00 | 2022-09-07 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0725A0002323R.PL-00338_004 | 2022-08-31 10:58:16 | 2022-08-11 05:00 | 2022-09-01 08:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-0909A0002323R.PL-00419_002 | 2022-09-11 13:40:52 | 2022-09-11 05:00 | 2022-09-11 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] KOP23-LIS20 | 400 [MW] | Utrzymanie | |
22-0916A0002323R.PL-00433_002 | 2022-09-17 07:32:27 | 2022-09-18 05:00 | 2022-09-18 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013244] PLE44-KRA44 | 1 386 [MW] | Utrzymanie | |
22-0526A0002323R.PL-00243_002 | 2022-05-31 12:00:00 | 2022-05-12 05:00 | 2022-06-01 04:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000039] VIE40-KRA44 | 1 039 [MW] | Inne | |
22-0830A0002323R.PL-00399_002 | 2022-08-31 11:44:58 | 2022-08-31 05:00 | 2022-08-31 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013155] CRN44-PAS44 | 1 150 [MW] | Utrzymanie | |
22-0802A0002323R.PL-00359_003 | 2022-09-06 05:31:16 | 2022-09-07 05:00 | 2022-09-08 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] 1 386 [MW] | Utrzymanie | |
22-0905A0002323R.PL-00414_001 | 2022-09-05 13:00:11 | 2022-09-05 07:00 | 2022-09-05 09:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Awaria | |
22-0902A0002323R.PL-00408_002 | 2022-09-09 11:40:17 | 2022-09-05 05:00 | 2022-09-09 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
22-0701A0002323R.PL-00294_002 | 2022-07-01 11:58:33 | 2022-07-02 05:00 | 2022-07-03 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0902A0002323R.PL-00410_002 | 2022-09-06 05:28:35 | 2022-09-07 05:00 | 2022-09-07 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013155] CRN44-PAS44 | 1 150 [MW] | Utrzymanie | |
22-0915A0002323R.PL-00432_001 | 2022-09-15 11:43:34 | 2022-09-16 08:00 | 2022-09-16 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000338Z] BUJ23-BYC23 | 446 [MW] | Utrzymanie | |
22-0920A0002323R.PL-00437_002 | 2022-09-21 10:50:55 | 2022-09-23 09:00 | 2022-09-23 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-0701A0002323R.PL-00295_002 | 2022-07-01 11:59:04 | 2022-07-02 05:00 | 2022-07-03 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006410N] POL24-LES24 | 377 [MW] | Utrzymanie | |
22-0704A0002323R.PL-00301_001 | 2022-07-04 06:20:29 | 2022-07-05 06:00 | 2022-07-05 09:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001293Q] LMS41-OST41 | 2 058 [MW] | Utrzymanie | |
22-0725A0002323R.PL-00330_004 | 2022-08-26 09:39:34 | 2022-08-23 06:00 | 2022-08-26 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
22-0701A0002323R.PL-00298_003 | 2022-07-05 07:19:15 | 2022-07-06 07:00 | 2022-07-08 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0713A0002323R.PL-00313_001 | 2022-07-13 05:38:26 | 2022-07-14 07:00 | 2022-07-14 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0902A0002323R.PL-00411_001 | 2022-09-02 12:03:32 | 2022-09-05 05:00 | 2022-09-06 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013155] CRN44-PAS44 | 1 150 [MW] 1 150 [MW] | Utrzymanie | |
22-0907A0002323R.PL-00417_002 | 2022-09-07 15:11:36 | 2022-09-09 05:00 | 2022-09-09 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013155] CRN44-PAS44 | 1 150 [MW] | Utrzymanie | |
22-0716A0002323R.PL-00317_001 | 2022-07-16 02:18:16 | 2022-07-16 01:00 | 2022-07-17 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] KOP23-LIS20 | 400 [MW] | Awaria | |
22-0606A0002323R.PL-00255_001 | 2022-06-06 12:55:54 | 2022-06-08 21:00 | 2022-06-08 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0609A0002323R.PL-00258_001 | 2022-06-09 09:21:13 | 2022-06-10 06:00 | 2022-06-10 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000382W] LSN24-MIK24 | 465 [MW] | Utrzymanie | |
22-0624A0002323R.PL-00288_003 | 2022-07-25 07:23:22 | 2022-07-23 05:00 | 2022-08-02 05:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-0426A0002323R.PL-00168_002 | 2022-05-27 04:43:57 | 2022-05-26 05:00 | 2022-05-27 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013147] CRN44-MIK44 | 1 787 [MW] 1 787 [MW] | Utrzymanie | |
22-0522A0002323R.PL-00228_005 | 2022-05-26 16:28:39 | 2022-05-23 06:00 | 2022-05-26 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0725A0002323R.PL-00333_001 | 2022-07-25 12:09:26 | 2022-08-22 08:00 | 2022-08-22 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000063911] DBN43-PAS44 | 1 386 [MW] | Utrzymanie | |
22-0725A0002323R.PL-00334_001 | 2022-07-25 12:09:43 | 2022-08-10 07:00 | 2022-08-10 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00002E] BUJ23-LIS20 | 400 [MW] | Utrzymanie | |
22-0526A0002323R.PL-00246_002 | 2022-06-01 04:27:25 | 2022-06-02 05:00 | 2022-06-09 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0607A0002323R.PL-00256_001 | 2022-06-07 04:50:22 | 2022-06-08 02:00 | 2022-06-08 09:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-0728A0002323R.PL-00343_001 | 2022-07-28 05:24:59 | 2022-07-29 08:00 | 2022-07-29 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Modernizacja | |
22-0606A0002323R.PL-00253_002 | 2022-06-08 15:38:58 | 2022-06-07 05:00 | 2022-06-08 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004057N] MIK44_MIK24_AT-1 | 550 [MW] 550 [MW] | Utrzymanie | |
22-0625A0002323R.PL-00291_001 | 2022-06-25 09:50:59 | 2022-07-16 05:00 | 2022-07-17 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000003710] SWI24-MIK24 | 362 [MW] 362 [MW] | Utrzymanie | |
22-0726A0002323R.PL-00341_002 | 2022-07-30 14:43:18 | 2022-07-27 04:00 | 2022-07-30 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-0610A0002323R.PL-00259_001 | 2022-06-10 06:22:20 | 2022-06-11 05:00 | 2022-06-12 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0520A0002323R.PL-00224_010 | 2022-06-29 14:02:18 | 2022-05-21 09:00 | 2022-07-13 06:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-0525A0002323R.PL-00240_004 | 2022-06-15 12:05:01 | 2022-06-14 06:00 | 2022-06-15 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0513A0002323R.PL-00214_003 | 2022-06-15 15:38:06 | 2022-06-11 05:00 | 2022-06-15 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-00002B] HAG40-MIK44 | 1 732 [MW] | Utrzymanie | |
22-0704A0002323R.PL-00300_001 | 2022-07-04 06:20:12 | 2022-07-05 06:00 | 2022-07-05 09:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001294O] LMS41-OST41 | 2 058 [MW] | Utrzymanie | |
22-0618A0002323R.PL-00278_001 | 2022-06-18 17:26:21 | 2022-06-19 05:00 | 2022-06-19 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-0711A0002323R.PL-00310_002 | 2022-07-13 13:11:55 | 2022-07-13 05:00 | 2022-07-14 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Modernizacja | |
22-0623A0002323R.PL-00284_001 | 2022-06-23 11:29:28 | 2022-06-25 14:00 | 2022-06-25 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0531A0002323R.PL-00250_001 | 2022-05-31 12:21:20 | 2022-06-02 20:00 | 2022-06-02 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0526A0002323R.PL-00245_002 | 2022-06-01 04:26:55 | 2022-06-02 05:00 | 2022-06-09 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006410N] POL24-LES24 | 377 [MW] | Utrzymanie | |
22-0513A0002323R.PL-00211_004 | 2022-06-03 11:08:27 | 2022-06-01 05:00 | 2022-06-03 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00002E] BUJ23-LIS20 | 400 [MW] | Utrzymanie | |
22-0803A0002323R.PL-00361_002 | 2022-08-03 15:09:11 | 2022-08-03 13:00 | 2022-08-03 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000382W] LSN24-MIK24 | 465 [MW] | Awaria | |
22-0513A0002323R.PL-00212_003 | 2022-06-04 11:28:41 | 2022-06-04 05:00 | 2022-06-04 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-0914A0002323R.PL-00424_003 | 2022-11-10 21:39:03 | 2022-10-24 05:00 | 2022-11-10 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00001G] DBN43-ALB40 | 1 386 [MW] | Utrzymanie | |
22-1003A0002323R.PL-00462_001 | 2022-10-03 12:49:19 | 2022-10-06 05:00 | 2022-10-10 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-1003A0002323R.PL-00463_001 | 2022-10-03 12:49:39 | 2022-10-05 05:00 | 2022-10-05 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-0914A0002323R.PL-00426_003 | 2022-10-03 05:28:23 | 2022-10-04 05:00 | 2022-10-04 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006410N] POL24-LES24 | 377 [MW] | Utrzymanie | |
22-0825A0002323R.PL-00394_006 | 2022-10-07 07:11:27 | 2022-09-12 05:00 | 2022-10-09 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0914A0002323R.PL-00431_006 | 2022-11-01 19:35:33 | 2022-10-24 05:00 | 2022-10-31 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-1020A0002323R.PL-00492_004 | 2022-11-01 19:53:12 | 2022-10-24 07:00 | 2022-11-30 23:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Utrzymanie | |
22-1007A0002323R.PL-00474_002 | 2022-10-07 07:25:08 | 2022-10-10 05:00 | 2022-10-10 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] KOP23-LIS20 | 400 [MW] | Utrzymanie | |
22-1007A0002323R.PL-00477_002 | 2022-10-09 16:06:06 | 2022-10-09 05:00 | 2022-10-09 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00001W] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
22-1006A0002323R.PL-00470_002 | 2022-10-07 06:44:12 | 2022-10-06 05:00 | 2022-10-10 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006410N] POL24-LES24 | 377 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00528_001 | 2022-11-02 06:56:49 | 2023-10-09 05:00 | 2023-10-09 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013155] CRN44-PAS44 | 1 150 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00504_001 | 2022-11-02 06:49:30 | 2023-12-06 06:00 | 2023-12-08 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013147] CRN44-MIK44 | 1 787 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00506_001 | 2022-11-02 06:50:01 | 2023-10-04 05:00 | 2023-10-04 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006437F] PAS44-MIK44 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00529_001 | 2022-11-02 06:57:04 | 2023-10-02 05:00 | 2023-10-03 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00001W] KRI42-LEM40 | 1 039 [MW] 1 039 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00509_001 | 2022-11-02 06:50:50 | 2023-05-06 05:00 | 2023-05-06 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013244] PLE44-KRA44 | 1 386 [MW] | Utrzymanie | |
22-1007A0002323R.PL-00476_002 | 2022-10-09 16:05:45 | 2022-10-09 05:00 | 2022-10-09 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00542_001 | 2022-11-02 07:00:38 | 2023-05-08 05:00 | 2023-05-13 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00526_001 | 2022-11-02 06:56:17 | 2023-10-19 05:00 | 2023-10-19 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000063911] DBN43-PAS44 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00527_001 | 2022-11-02 06:56:32 | 2023-10-16 05:00 | 2023-10-22 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-1013A0002323R.PL-00482_001 | 2022-10-13 05:28:47 | 2022-10-14 07:00 | 2022-10-14 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000338Z] BUJ23-BYC23 | 446 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00532_001 | 2022-11-02 06:57:52 | 2023-09-08 06:00 | 2023-09-08 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00537_001 | 2022-11-02 06:59:17 | 2023-08-21 05:00 | 2023-09-01 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00001W] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00538_001 | 2022-11-02 06:59:33 | 2023-06-19 05:00 | 2023-07-02 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] KOP23-LIS20 | 400 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00553_001 | 2022-11-02 07:03:43 | 2023-11-20 06:00 | 2023-11-25 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
22-0929A0002323R.PL-00452_001 | 2022-09-29 04:46:20 | 2022-09-30 14:00 | 2022-09-30 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000063911] DBN43-PAS44 | 1 386 [MW] | Utrzymanie | |
22-0802A0002323R.PL-00353_002 | 2022-09-22 13:26:32 | 2022-09-24 05:00 | 2022-09-25 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013147] CRN44-MIK44 | 1 787 [MW] 1 787 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00539_001 | 2022-11-02 06:59:48 | 2023-05-31 05:00 | 2023-05-31 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013155] CRN44-PAS44 | 1 150 [MW] | Utrzymanie | |
22-0922A0002323R.PL-00439_001 | 2022-09-22 13:10:32 | 2022-09-22 05:00 | 2022-09-22 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-0914A0002323R.PL-00430_003 | 2022-10-03 05:28:02 | 2022-10-04 05:00 | 2022-10-04 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00552_001 | 2022-11-02 07:03:28 | 2023-12-11 06:00 | 2023-12-22 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00554_001 | 2022-11-02 07:03:59 | 2023-10-18 05:00 | 2023-10-18 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000377P] DBN43-PAS44 | 1 316 [MW] | Utrzymanie | |
22-0925A0002323R.PL-00444_001 | 2022-09-25 07:19:16 | 2022-10-02 06:00 | 2022-10-02 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00557_001 | 2022-11-02 07:04:50 | 2023-05-01 05:00 | 2023-05-26 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00001W] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00560_001 | 2022-11-02 07:05:37 | 2023-10-04 05:00 | 2023-10-05 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] KRI42-LEM40 | 1 039 [MW] 1 039 [MW] | Utrzymanie | |
22-0929A0002323R.PL-00454_001 | 2022-09-29 16:05:05 | 2022-09-30 05:00 | 2022-09-30 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-0929A0002323R.PL-00455_001 | 2022-09-29 16:06:05 | 2022-09-29 05:00 | 2022-09-29 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
23-0303A0002323R.PL-00121_004 | 2023-03-25 16:55:54 | 2023-03-21 06:00 | 2023-03-25 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004057N] MIK44_MIK24_AT-1 | 550 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00547_004 | 2023-03-28 07:27:00 | 2023-04-03 05:00 | 2023-04-06 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00002E] BUJ23-LIS20 | 400 [MW] | Utrzymanie | |
22-1221A0002323R.PL-00634_002 | 2022-12-24 11:10:10 | 2022-12-24 09:00 | 2022-12-24 10:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
23-0224A0002323R.PL-00098_001 | 2023-02-24 07:11:38 | 2023-03-09 07:00 | 2023-03-10 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-00001D] HAG40-MIK44 | 1 732 [MW] | Modernizacja | |
22-1215A0002323R.PL-00621_002 | 2022-12-16 14:08:11 | 2022-12-18 06:00 | 2022-12-18 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-1217A0002323R.PL-00624_002 | 2022-12-18 12:40:27 | 2022-12-17 11:00 | 2022-12-18 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000338Z] BUJ23-BYC23 | 446 [MW] | Awaria | |
22-1216A0002323R.PL-00623_002 | 2022-12-18 13:31:05 | 2022-12-18 06:00 | 2022-12-18 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006425A] SDU41-NAR41 | 831 [MW] | Utrzymanie | |
23-0107A0002323R.PL-00014_006 | 2023-01-08 14:42:43 | 2023-01-07 16:00 | 2023-01-08 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Awaria | |
23-0324A0002323R.PL-00145_005 | 2023-03-30 12:44:34 | 2023-04-06 06:00 | 2023-04-06 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
23-0222A0002323R.PL-00094_004 | 2023-02-25 17:17:43 | 2023-02-25 06:00 | 2023-02-25 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000382W] LSN24-MIK24 | 465 [MW] | Utrzymanie | |
23-0225A0002323R.PL-00099_002 | 2023-02-26 07:35:20 | 2023-02-27 15:00 | 2023-02-27 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-1229A0002323R.PL-00638_002 | 2022-12-29 14:54:21 | 2022-12-29 13:00 | 2022-12-29 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00002E] BUJ23-LIS20 | 400 [MW] | Awaria | |
23-0330A0002323R.PL-00160_001 | 2023-03-30 12:45:53 | 2023-04-07 06:00 | 2023-04-07 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
23-0329A0002323R.PL-00159_003 | 2023-03-30 12:47:10 | 2023-04-05 07:00 | 2023-04-05 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
23-0125A0002323R.PL-00046_001 | 2023-01-25 09:42:59 | 2023-02-01 06:00 | 2023-02-01 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000063911] DBN43-PAS44 | 1 386 [MW] | Utrzymanie | |
23-0221A0002323R.PL-00089_002 | 2023-02-26 16:34:18 | 2023-02-23 06:00 | 2023-02-26 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-1226A0002323R.PL-00636_004 | 2022-12-30 14:53:13 | 2022-12-27 06:00 | 2022-12-30 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Modernizacja | |
22-1102A0002323R.PL-00546_003 | 2023-03-31 07:18:19 | 2023-04-03 05:00 | 2023-04-30 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
23-0227A0002323R.PL-00104_003 | 2023-02-28 19:28:12 | 2023-02-28 16:00 | 2023-02-28 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-1130A0002323R.PL-00604_005 | 2023-03-14 08:48:10 | 2023-03-01 11:00 | 2023-04-30 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-1102A0002323R.PL-00541_002 | 2023-03-31 09:25:23 | 2023-05-25 06:00 | 2023-06-07 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000338Z] BUJ23-BYC23 | 446 [MW] | Utrzymanie | |
23-0331A0002323R.PL-00164_001 | 2023-03-31 09:28:42 | 2023-04-17 06:00 | 2023-05-05 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00002E] BUJ23-LIS20 | 400 [MW] | Utrzymanie | |
23-0125A0002323R.PL-00045_003 | 2023-01-25 14:33:38 | 2023-02-03 13:00 | 2023-02-03 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000063911] DBN43-PAS44 | 1 386 [MW] | Modernizacja | |
22-1102A0002323R.PL-00543_003 | 2023-03-06 13:37:59 | 2023-04-17 05:00 | 2023-04-22 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
23-0224A0002323R.PL-00095_006 | 2023-03-21 06:47:54 | 2023-03-21 06:00 | 2023-03-21 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013244] PLE44-KRA44 | 1 386 [MW] | Utrzymanie | |
23-0224A0002323R.PL-00097_004 | 2023-03-31 12:32:10 | 2023-03-23 06:00 | 2023-04-01 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Modernizacja | |
23-0331A0002323R.PL-00165_001 | 2023-03-31 12:34:44 | 2023-04-03 05:00 | 2023-04-06 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Modernizacja | |
23-0126A0002323R.PL-00063_001 | 2023-01-26 14:20:31 | 2023-01-28 06:00 | 2023-01-28 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006425A] SDU41-NAR41 | 831 [MW] | Utrzymanie | |
23-0322A0002323R.PL-00142_001 | 2023-03-22 13:21:57 | 2023-04-13 05:00 | 2023-04-14 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006422G] ZAM22-MKR22 | 377 [MW] 377 [MW] | Utrzymanie | |
23-0323A0002323R.PL-00144_002 | 2023-03-31 13:16:56 | 2023-03-31 05:00 | 2023-03-31 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006437F] PAS44-MIK44 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00559_005 | 2023-03-31 15:01:06 | 2023-02-15 07:00 | 2023-03-31 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00004A] WIE43-NOS40 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00550_006 | 2023-02-08 16:50:25 | 2023-01-24 07:00 | 2023-02-08 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
23-0306A0002323R.PL-00122_002 | 2023-03-08 13:35:41 | 2023-03-13 07:00 | 2023-03-13 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-0919A0002323R.PL-00435_002 | 2022-09-22 13:04:12 | 2022-09-21 05:00 | 2022-09-21 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00549_005 | 2023-03-31 15:02:28 | 2023-02-15 07:00 | 2023-03-31 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00001G] DBN43-ALB40 | 1 386 [MW] | Utrzymanie | |
23-0331A0002323R.PL-00163_002 | 2023-04-01 11:45:45 | 2023-04-01 06:00 | 2023-04-01 10:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000338Z] BUJ23-BYC23 | 446 [MW] | Utrzymanie | |
23-0308A0002323R.PL-00126_004 | 2023-03-16 14:11:34 | 2023-03-16 07:00 | 2023-03-16 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
23-0214A0002323R.PL-00085_005 | 2023-02-21 20:50:14 | 2023-02-16 06:00 | 2023-02-21 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00545_004 | 2023-03-30 12:17:38 | 2023-04-03 04:00 | 2023-04-08 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
23-0318A0002323R.PL-00141_002 | 2023-03-19 06:40:01 | 2023-03-19 07:00 | 2023-03-20 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-1130A0002323R.PL-00597_003 | 2023-03-24 14:21:15 | 2023-04-05 05:00 | 2023-05-15 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064268] SDU41-STN41 | 1 358 [MW] | Modernizacja | |
23-0324A0002323R.PL-00148_001 | 2023-03-24 15:07:25 | 2023-04-14 04:00 | 2023-04-16 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
23-0324A0002323R.PL-00149_001 | 2023-03-24 15:07:41 | 2023-04-23 04:00 | 2023-04-25 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-1130A0002323R.PL-00596_001 | 2022-11-30 11:36:16 | 2023-10-03 05:00 | 2023-11-14 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-1206A0002323R.PL-00616_001 | 2022-12-06 08:50:56 | 2023-01-19 07:00 | 2023-01-19 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004058L] MIK44_MIK24_AT-2 | 550 [MW] | Utrzymanie | |
22-0923A0002323R.PL-00441_007 | 2022-12-07 06:36:12 | 2022-11-30 23:00 | 2022-12-31 23:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Inne | |
23-0131A0002323R.PL-00072_003 | 2023-02-03 21:42:48 | 2023-01-31 06:00 | 2023-02-03 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-0927A0002323R.PL-00451_001 | 2022-09-27 14:59:47 | 2022-09-28 08:00 | 2022-09-28 13:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000338Z] BUJ23-BYC23 | 446 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00522_002 | 2022-11-30 08:02:46 | 2023-12-04 06:00 | 2023-12-09 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
22-1130A0002323R.PL-00606_001 | 2022-11-30 15:29:35 | 2023-10-02 05:00 | 2023-10-08 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
23-0204A0002323R.PL-00077_002 | 2023-02-04 15:13:59 | 2023-02-04 10:00 | 2023-02-04 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Modernizacja | |
22-1102A0002323R.PL-00530_002 | 2022-11-30 08:16:49 | 2023-09-30 18:00 | 2023-09-30 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00556_003 | 2022-11-30 08:46:09 | 2023-06-12 05:00 | 2023-07-05 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013155] CRN44-PAS44 | 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] 1 150 [MW] | Utrzymanie | |
22-1208A0002323R.PL-00618_001 | 2022-12-08 13:48:02 | 2022-12-10 20:00 | 2022-12-11 07:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
23-0110A0002323R.PL-00017_001 | 2023-01-10 15:38:25 | 2023-01-10 06:00 | 2023-01-10 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Utrzymanie | |
22-1130A0002323R.PL-00594_001 | 2022-11-30 11:35:42 | 2023-07-18 05:00 | 2023-07-18 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000006410N] POL24-LES24 | 377 [MW] | Utrzymanie | |
22-1130A0002323R.PL-00595_001 | 2022-11-30 11:36:00 | 2023-09-14 05:00 | 2023-09-23 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000377P] DBN43-PAS44 | 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] | Utrzymanie | |
22-1126A0002323R.PL-00588_002 | 2022-12-01 13:45:09 | 2022-12-05 07:00 | 2022-12-06 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] 1 358 [MW] | Utrzymanie | |
23-0109A0002323R.PL-00015_001 | 2023-01-09 12:39:24 | 2023-01-11 08:00 | 2023-01-11 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
23-0104A0002323R.PL-00005_002 | 2023-01-10 15:16:41 | 2023-01-09 06:00 | 2023-01-09 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00507_001 | 2022-11-02 06:50:18 | 2023-07-24 05:00 | 2023-08-04 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-00001D] HAG40-MIK44 | 1 732 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00508_001 | 2022-11-02 06:50:34 | 2023-06-26 05:00 | 2023-07-07 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-00002B] HAG40-MIK44 | 1 732 [MW] | Utrzymanie | |
22-1202A0002323R.PL-00608_001 | 2022-12-02 06:34:42 | 2022-12-03 07:00 | 2022-12-03 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000382W] LSN24-MIK24 | 465 [MW] | Utrzymanie | |
22-1205A0002323R.PL-00613_001 | 2022-12-05 16:48:06 | 2022-12-07 09:00 | 2022-12-07 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006437F] PAS44-MIK44 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00502_005 | 2022-12-03 15:31:42 | 2022-12-03 06:00 | 2022-12-03 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-00002B] HAG40-MIK44 | 1 732 [MW] | Utrzymanie | |
22-1215A0002323R.PL-00622_001 | 2022-12-15 07:09:01 | 2022-12-17 07:00 | 2022-12-17 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013244] PLE44-KRA44 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00523_001 | 2022-11-02 06:55:28 | 2023-12-02 14:00 | 2023-12-02 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00536_001 | 2022-11-02 06:58:56 | 2023-08-28 05:00 | 2023-09-12 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000377P] DBN43-PAS44 | 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] 1 316 [MW] | Utrzymanie | |
22-1026A0002323R.PL-00498_002 | 2022-11-17 06:48:45 | 2022-11-21 05:00 | 2022-11-25 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00531_001 | 2022-11-02 06:57:36 | 2023-09-18 05:00 | 2023-09-30 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SK-00002U] KRI42-LEM40 | 1 039 [MW] | Utrzymanie | |
23-0113A0002323R.PL-00021_001 | 2023-01-13 11:46:45 | 2023-01-13 08:00 | 2023-01-13 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-00001D] HAG40-MIK44 | 1 732 [MW] | Utrzymanie | |
22-1126A0002323R.PL-00587_001 | 2022-11-26 10:18:08 | 2022-12-01 06:00 | 2022-12-02 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000382W] LSN24-MIK24 | 465 [MW] 465 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00535_001 | 2022-11-02 06:58:40 | 2023-09-01 13:00 | 2023-09-01 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-1103A0002323R.PL-00565_001 | 2022-11-03 12:05:24 | 2022-11-06 06:00 | 2022-11-06 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-1206A0002323R.PL-00615_004 | 2023-01-13 18:14:40 | 2023-01-13 06:00 | 2023-01-13 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] KOP23-LIS20 | 400 [MW] | Utrzymanie | |
23-0116A0002323R.PL-00032_001 | 2023-01-16 13:04:17 | 2023-01-18 21:00 | 2023-01-19 05:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-1128A0002323R.PL-00591_001 | 2022-11-28 14:32:16 | 2022-11-30 06:00 | 2022-11-30 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013147] CRN44-MIK44 | 1 787 [MW] | Utrzymanie | |
22-1130A0002323R.PL-00599_001 | 2022-11-30 15:27:40 | 2023-10-31 23:00 | 2023-12-31 23:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-1130A0002323R.PL-00600_001 | 2022-11-30 15:27:56 | 2023-08-31 22:00 | 2023-10-31 23:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-1130A0002323R.PL-00601_001 | 2022-11-30 15:28:11 | 2023-06-30 22:00 | 2023-08-31 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-1130A0002323R.PL-00602_001 | 2022-11-30 15:28:30 | 2023-05-22 04:00 | 2023-05-28 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000037] ALY40-EKB41 | 500 [MW] | Utrzymanie | |
22-1130A0002323R.PL-00603_001 | 2022-11-30 15:28:46 | 2023-04-30 22:00 | 2023-06-30 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-1204A0002323R.PL-00612_004 | 2022-12-04 09:34:20 | 2022-12-04 06:00 | 2022-12-04 09:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Awaria | |
22-1102A0002323R.PL-00505_003 | 2022-11-30 11:26:44 | 2023-10-23 05:00 | 2023-11-28 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000382W] LSN24-MIK24 | 465 [MW] | Utrzymanie | |
22-1130A0002323R.PL-00593_001 | 2022-11-30 11:35:26 | 2023-08-12 05:00 | 2023-08-15 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013244] PLE44-KRA44 | 1 386 [MW] | Utrzymanie | |
22-1118A0002323R.PL-00582_001 | 2022-11-18 07:13:22 | 2022-11-19 06:00 | 2022-11-19 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] | Utrzymanie | |
22-1124A0002323R.PL-00586_001 | 2022-11-24 14:48:20 | 2022-11-27 06:00 | 2022-11-27 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00004A] WIE43-NOS40 | 1 386 [MW] | Utrzymanie | |
22-1102A0002323R.PL-00555_002 | 2022-11-30 07:54:04 | 2023-08-31 05:00 | 2023-09-19 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-1203A0002323R.PL-00611_002 | 2022-12-03 18:18:50 | 2022-12-03 17:00 | 2022-12-03 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Awaria | |
22-1102A0002323R.PL-00540_002 | 2022-11-30 07:50:08 | 2023-05-28 15:00 | 2023-05-28 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
23-0227A0002323R.PL-00105_002 | 2023-02-28 17:08:39 | 2023-02-28 15:00 | 2023-02-28 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000486K] OST21-MIL21 | 427 [MW] | Modernizacja | |
22-1102A0002323R.PL-00510_002 | 2023-03-24 13:07:26 | 2023-04-11 05:00 | 2023-04-13 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013244] PLE44-KRA44 | 1 386 [MW] | Utrzymanie | |
23-0224A0002323R.PL-00096_003 | 2023-03-17 18:41:46 | 2023-03-14 06:00 | 2023-03-17 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004058L] MIK44_MIK24_AT-2 | 550 [MW] | Utrzymanie | |
23-0103A0002323R.PL-00002_002 | 2023-02-02 09:04:47 | 2023-02-10 06:00 | 2023-02-10 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000004057N] MIK44_MIK24_AT-1 | 550 [MW] | Utrzymanie | |
22-0531A0002323R.PL-00249_004 | 2023-03-24 13:08:50 | 2022-06-01 04:00 | 2023-05-15 05:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-000047] KRA44-VIE40 | 1 039 [MW] | Inne | |
22-0914A0002323R.PL-00425_006 | 2022-10-03 13:26:33 | 2022-10-03 06:00 | 2022-10-03 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] KOP23-LIS20 | 400 [MW] | Utrzymanie | |
23-0105A0002323R.PL-00010_003 | 2023-01-05 15:11:57 | 2023-01-05 12:00 | 2023-01-05 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Awaria | |
23-0324A0002323R.PL-00147_001 | 2023-03-24 13:46:13 | 2023-04-17 05:00 | 2023-05-07 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Modernizacja | |
22-1117A0002323R.PL-00581_001 | 2022-11-17 06:47:34 | 2022-11-17 05:00 | 2022-11-18 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
22-1207A0002323R.PL-00617_004 | 2023-01-02 06:50:30 | 2022-12-31 23:00 | 2023-01-13 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-000029] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-1009A0002323R.PL-00479_003 | 2022-10-10 17:38:37 | 2022-10-09 21:00 | 2022-10-10 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Awaria | |
22-1010A0002323R.PL-00480_002 | 2022-10-13 07:39:08 | 2022-10-10 05:00 | 2022-10-13 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000063911] DBN43-PAS44 | 1 386 [MW] 1 386 [MW] 1 386 [MW] 1 386 [MW] | Utrzymanie | |
22-1013A0002323R.PL-00483_001 | 2022-10-13 07:46:00 | 2022-10-14 19:00 | 2022-10-14 22:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000377P] DBN43-PAS44 | 1 316 [MW] | Utrzymanie | |
22-1013A0002323R.PL-00484_001 | 2022-10-13 07:46:16 | 2022-10-14 05:00 | 2022-10-14 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000063911] DBN43-PAS44 | 1 386 [MW] | Utrzymanie | |
23-0125A0002323R.PL-00053_001 | 2023-01-25 13:43:12 | 2023-01-29 08:00 | 2023-01-29 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-PL-SE-000016] STO40-SDC45 | 600 [MW] | Utrzymanie | |
22-1221A0002323R.PL-00632_006 | 2023-01-25 16:07:54 | 2023-01-16 06:00 | 2023-01-25 15:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Modernizacja | |
22-0914A0002323R.PL-00428_003 | 2022-10-13 12:48:26 | 2022-10-14 05:00 | 2022-10-16 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000299J] MON44-DUN45 | 1 358 [MW] 1 358 [MW] 1 358 [MW] | Utrzymanie | |
22-0925A0002323R.PL-00447_002 | 2022-10-13 13:41:04 | 2022-10-15 05:00 | 2022-10-16 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013236] MON44-KRA44 | 1 552 [MW] 1 552 [MW] | Utrzymanie | |
22-1013A0002323R.PL-00485_002 | 2022-10-17 04:51:27 | 2022-10-17 05:00 | 2022-10-21 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000063911] DBN43-PAS44 | 1 386 [MW] 1 386 [MW] 1 386 [MW] 1 386 [MW] 1 386 [MW] | Utrzymanie | |
22-1126A0002323R.PL-00589_003 | 2022-12-17 18:44:59 | 2022-12-03 12:00 | 2022-12-17 20:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000001304A] RZE42-KRI42 | 1 358 [MW] | Utrzymanie | |
23-0125A0002323R.PL-00044_003 | 2023-02-14 19:12:54 | 2023-02-14 06:00 | 2023-02-14 19:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000377P] DBN43-PAS44 | 1 316 [MW] | Modernizacja | |
22-1229A0002323R.PL-00637_005 | 2022-12-30 21:38:03 | 2022-12-29 11:00 | 2022-12-30 21:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T110000006437F] PAS44-MIK44 | 1 386 [MW] | Awaria | |
22-1017A0002323R.PL-00486_002 | 2022-10-18 15:43:28 | 2022-10-17 06:00 | 2022-10-17 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-1018A0002323R.PL-00490_001 | 2022-10-18 15:50:30 | 2022-10-18 06:00 | 2022-10-18 16:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-1221A0002323R.PL-00631_004 | 2023-01-03 13:54:21 | 2023-01-03 06:00 | 2023-01-03 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-DE-PL-00001D] HAG40-MIK44 | 1 732 [MW] | Utrzymanie | |
23-0113A0002323R.PL-00023_001 | 2023-01-13 18:14:55 | 2023-01-14 07:00 | 2023-01-14 17:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-CZ-PL-00003C] KOP23-LIS20 | 400 [MW] | Utrzymanie | |
22-1018A0002323R.PL-00489_008 | 2022-10-19 18:00:00 | 2022-10-19 13:00 | 2022-10-19 18:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T000000000296P] KRI42-TAW43 | 1 386 [MW] | Utrzymanie | |
22-0902A0002323R.PL-00407_008 | 2022-10-24 06:27:59 | 2022-09-30 22:00 | 2022-10-24 07:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Inne | |
22-0922A0002323R.PL-00438_002 | 2022-09-23 12:02:35 | 2022-09-23 05:00 | 2022-09-23 12:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000064098] POL24-PLE24 | 377 [MW] | Utrzymanie | |
23-0203A0002323R.PL-00076_003 | 2023-02-13 09:23:05 | 2023-02-09 06:00 | 2023-02-14 14:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [19T0000000013171] KRM44-OSR44 | 1 247 [MW] | Utrzymanie | |
22-1130A0002323R.PL-00605_007 | 2023-02-28 06:38:23 | 2023-01-13 15:00 | 2023-03-01 11:00 | Active | ELECTRICITY | PSE SA A0002323R.PL [ace] | [10T-LT-PL-00001B] EKB41-ALY40 | 2 058 [MW] | Inne |